Opens in a new tab

RF & Network Installation

Trindom Global excels at professionally installing and integrating high-end traditional to next-generation RF and Networking solutions to help you solve all of your IT and IoT strategies.

Customized RF and Network Solutions

Trindom Global takes pride in offering our clients a dedicated source of qualified and certified technicians to install, test, and guarantee your customized RF and/or network solutions.

We'd love to bid on your next job!

Contact Us

Why Choose Us?

Trindom Global thrives in 3 main areas.

We provide turnkey project-managed solutions to ensure that your RF and Network installations are designed, constructed, and integrated with the highest standard of excellence.

Secondly, we work tirelessly to ensure the accuracy of our scope of work forecasts for all of our clients. Our implementation model has built-in metrics to gauge our progress, our level of excellence, and customer satisfaction.

Third, we practice the highest project management standards to ensure our projects are completed on time, within the budget, and with the highest quality of service.

These three areas are central to our vision, mission, and goals to be the best RF and Network installation company in the industry.

Contact Us

Wireless Systems

  • Microwave and Millimeter Wave Radios Dish
  • LNA and Power Amplifiers RF Testing
  • Equipment Pressurization
  • Dehydration Equipment
  • Hardware Connectors and Jumper Cables
  • Panel and Other Antennas
  • Coaxial Cable, Waveguide Cable Hanger/Fastening

Microwave & Milimeter-Wave Radios

  • Towers
  • Shelters
  • Cabinets and Racks
  • Cable Trays and Antenna Mounting
  • Hardware Distribution Panels and Cross Connects
  • Terminal Blocks

Power Systems

  • Batteries and Battery Backup (UPS and Other)
  • Charging Systems
  • Power Converters
  • Power Inverters
  • Power Rectifiers
  • Generators
  • Lightning Protection
  • Power Distribution
  • Line Conditioners
  • POE (Power over Ethernet)

LAN/WAN/Edge Access Hardware

  • CSUs/DSUs and Digital Loop Carrier Systems
  • Modems, Line Drivers and Other CPE
  • Multiplexers, Channel Banks and T1/E1 Converters
  • Digital Cross Connect Systems (DACS)
  • DSX Panels/Modules
  • Routers and Switches