Structured Cabling & Headend Buildout

Trindom Global is a leader in Structured Cabling solutions, ready to help you with your new installations, upgrades, or existing cabling maintenance projects.

End-To-End, Project-Managed Solutions

Trindom Global provides the best Structured Cabling solutions on the market! With more than 20 years of professional design-build experience, Trindom Global stands on its guarantee to understand your goals and design the right solution to match.

We'd love to bid on your next job!

Contact Us

Why Choose Us?

We approach Structured Cabling like we approach all our high-tech installations; with excellence. From the start, we want to listen to understand your needs, your goals, and your constraints. We will work to provide you with a professional Statement of Work and a dedicated project manager and tech team for the entire installation, integration, testing, and sign-off of your new infrastructure. Trindom Global provides you with professional installation, connection, integration, and testing services to ensure the highest efficiency between your MDF Room, IDF Rooms, and termination points.

Contact Us

Entrance Facilities

An Entrance Facility is a point where all the external cables from the various service providers connect to the backbone of the facility’s cabling system. The backbone cable then connects these cables to the MDF Room and each of the IDF rooms throughout the facility. Trindom Global removes, upgrades, and installs new Entrance Facility cabling, security, and compliance solutions for your business, guaranteed. We work with you to ensure a safe, secure, and regulated exchange from external service providers to your building and MDF Rooms.

Main Distribution Frame (MDF) Room

The Main Distribution Frame (MDF) Room is the mainframe and central distribution center for the entire building. The MDF Room contains components such as power supplies, servers, hubs, routers, file servers, data processing equipment, racks, patch panels, jumpers, phone systems, and other WAN and LAN equipment. Trindom Global specializes in new installation, upgrades, and maintenance of your entire MDF component and device list, providing you peace of mind with our end-to-end lead project management.

Independent Distribution Frame (IDF) Rooms

The Independent Distribution Frame Room is an environmentally controlled area that interconnects and manages the IT and/or telecommunications wiring between an MDF and workstation devices. It’s also where local cables, called jumpers or patch cords, are used on patch panels to cross-connect different cables. IDF Rooms connect individual computers, laptops, and printers on each floor or section to source servers located back in the MDF Room. Trindom Global works to provide experienced and sound expert installation, connection, integration, and testing solutions to ensure the connection between your MDF Room, IDF Rooms and termination points is at the highest maximum efficiency.

Trunk & Home Run Cabling

Getting telecom resources to users at their work areas or other rooms on a given floor is the job of home run cabling. Also called horizontal cabling, home run cabling will connect users on a given floor to that floor’s Independent Distribution Frame (IDF) room. Home run cabling includes the cable, connectors, patch panels, and patch cords in the IDF room. Our experts will analyze, design, develop, and install these home run cabling components as part of an overall structured cabling strategy for your organization.

Headend Buildout

Headend refers to any facility or equipment used to receive, process, and transmit communication signals. Trindom Global excels in providing professional headend buildout services to ensure best-practices uptime and speed for communications throughout your office, building, or campus. Trindom Global prides itself in being a top end-to-end installer of TV, Phone, Wireless, or LAN systems. Ask about our design-build and project-managed approach, saving you time, money, and lots of unneeded stress.

Proprietary Headend Buildout Solutions:
  • Site Survey & Inspection of Current Equipment
  • Design-Build Strategy W/ Customized Scope Of Work
  • Pre-Construction Scope Of Work Explanation
  • Scope of Work Signoff
  • Lead Project Management of Scope of Work
  • Cable Organization, Management, and Identification
  • TV and/or Network Upgrades
  • Minimal Company Operational Disruption
 
Headend Components:
 
Jumpers, Switches, Routers, Firewalls, Wireless Controllers, Cable Managers, Cable Lacers, Satellite Dishes and Receivers, Microwave Receivers, Transmitters, and more.

Project Management & Integration Capabilities

  • Design-Build Scope of Work
  • Work in tandem with site EPM Pre-Construction
  • Within Time & Budget Constraints
  • Gantt Chart Management of Cross-Trained Techs
  • Maintain All Quality Control and Safety Measures
  • Flexible and Adaptable To Global Project SOW Uncertainties
  • Ongoing Cert Training
  • Full Access To Daily Reports
  • Fiber and Copper Cable
  • Low-volt Cable and Install Solutions
  • Wireless Application Protocol Install Solutions
  • Telemetry System Install Solutions
  • Rack & Stack Install Solutions
  • Infrastructure Deployments & Rollouts
  • Data Center Partial & Complete Build-Outs
  • On-going Support & Maintenance Planning Documentation, Network Drawings
  • Lead Project/Program Management Services

Turnkey Structured Cabling Solutions